How to Get Involved
Contact Us
About Us
Concrete Coalition
Building Profile
The purpose of this form is to gather basic information on seismic evaluation and retrofit.
Contributor information
Name:
Willing to provide additional information?
Yes
No
Maybe
Explain
Firm:
Contact data:
email
telephone
Date Form Completed
Building information
(Name, location, and owner may be omitted if necessary. Please provide zip code.)
Name:
Owner:
Location:
Zip code:
Other Identifier
Lat:
Long:
Date of original construction
Size:
gross area
sf
height above grade
ft
no. of stories above grade
no. of stories below grade
Functional use(s) - check all applicable
residential
office
commercial
industrial
government
medical
education
emergency services
assembly
other
Original design data:
Code:
Design drawings available?
Yes
No
NEHRP building type - check all applicable
C1
C2
C2A
C3
C3A
PC2
PC2A
other
Vertical load carrying system(s) and components - check all applicable
flat slab
one-way slab and beam
two-way slab and beam
pan-loist
waffle
columns
R/C bearing walls
infill walls
other
Lateral resisting system(s) and components - check all applicable
MR frame
R/C walls
infill walls
slab/column frame
other
Foundations
isolated spreads
mat
piers/piles
other
Evaluation
Criteria
FEMA 178
FEMA 310
FEMA 356/ASCE 41 linear
FEMA 356/ASCE 41 nonlinear static
nonlinear dynamic
other
Deficiencies - check all applicable
discontinuous wall(s)
short/captive columns
shear critical columns
strong beam/weak column
punching shear
beam-col joint
shear critical walls/panels
flexure critical walls/panels
foundation rocking/sliding
other
Expected performance prior to retrofit
Performance level
Shaking intensity
Functional
Immediate
occupancy
Life safety
Collapse
prevention
Frequent (50%50yr)
Rare (10%50yr)
Very rare (2%50yr)
Retrofit
Techniques - check all applicable
add walls
wrap columns
add braces
add moment frame
add backup columns
reinforce walls
reinforce/expand foundation
base isolation
damping
other
Occupants
remained in building
internally moved
completely removed
Cost as a percentage of replacement value
<10%
10%-30%
30%-50%
50%-70%
>70%
Expected performance prior to retrofit
Performance level
Shaking intensity
Functional
Immediate
occupancy
Life safety
Collapse
prevention
Frequent (50%50yr)
Rare (10%50yr)
Very rare (2%50yr)
Photographs/sketches
Please provide a few annotated pictures, drawings, analytical data, etc.
Additional information
Please provide any additional information that you feel is pertinent.
How to Get Involved
Background
Problem Statement
Project Approach
Inventory Project
Coalition Documents
Resources and Links
Coalition Sponsors